
The first elements of the building foundation are
in place .
(Sep. 12)
|

A very good view of the water tank structure for
the acoustics lab.
|

Foundation at the south end of the building.
|

Lots of heavy equipment.
|

A view of the work looking west.
|

An even better view of the water tank construction.
|

The foundation wall along the length from east to
west.
|

The crane appears to dwarf the Marston water tower
in this image.
|
|