The water tank after additional work .
(Sep. 29)


The south wall of the lower level and the start of structural columns.


The concrete trucks roll in as the column footings are put in place .


A portion of the north wall goes up.


A view of the foundation for the circular auditorium.


A good overview of the foundation work.