The water tank after additional work . (Sep. 29)
The south wall of the lower level and the start of structural columns.
The concrete trucks roll in as the column footings are put in place .
A portion of the north wall goes up.
A view of the foundation for the circular auditorium.
A good overview of the foundation work.
Back to Digital Moments page
Construction | Dedication | C-6 | Departments | ETRC Home