The window frame for the corner stairway is being put in place
in anticipation of colder weather.
(Oct.30)
|

All of the framing is in place for the front glass wall. Plastic
will be put over the frame until the glass is ready to go in.
|

A look down the North wall shows that almost all of the windows
are in place.
|
|

The brick wall that extends from the sloped glass wall requires
custom bricks to complete the corner.
|

The masons are still at work in various locations around the site.
Here they add more of the brick facade to the auditorium.
|

Framing has begun on what will be the main entrance to Howe Hall.
|
|
A look across the high-bay area shows that railings are being
constructed where hallways will be located.
|

A look across what has become an increasingly darker high-bay
area as the building gets closer to becoming completely enclosed.
|

Block walls and door frames are in place in some areas of the
basement.
|
|

What is now a large open area will soon be divided into classrooms,
labs, and offices.
|

Metal wall studs form one of the hallways on the second floor.
|
|