The window frame for the corner stairway is being put in place in anticipation of colder weather.
(Oct.30)


All of the framing is in place for the front glass wall. Plastic will be put over the frame until the glass is ready to go in.


A look down the North wall shows that almost all of the windows are in place.


The brick wall that extends from the sloped glass wall requires custom bricks to complete the corner.


The masons are still at work in various locations around the site. Here they add more of the brick facade to the auditorium.


Framing has begun on what will be the main entrance to Howe Hall.


A look across the high-bay area shows that railings are being constructed where hallways will be located.


A look across what has become an increasingly darker high-bay area as the building gets closer to becoming completely enclosed.


Block walls and door frames are in place in some areas of the basement.


What is now a large open area will soon be divided into classrooms, labs, and offices.


Metal wall studs form one of the hallways on the second floor.