The steps are now in place in the auditorium.
(May 5)
|

The brickwork on the outside of the auditorium has been started.
|

The exterior brickwork will be applied to the concrete panels
that have been put in place.
|

A view that shows the curved facade on the front corner of Howe
Hall. |

Looking toward campus into the high-bay area. |

They've even begun on the ductwork for the heating and cooling
systems. |

The outside of the auditorium with the scaffolding for the masons.
|

One of the crane operators that have played an important role
in the construction process.
|

The high-bay area looking west.
|