The steps are now in place in the auditorium.
(May 5)

The brickwork on the outside of the auditorium has been started.

The exterior brickwork will be applied to the concrete panels that have been put in place.

A view that shows the curved facade on the front corner of Howe Hall.

Looking toward campus into the high-bay area.

They've even begun on the ductwork for the heating and cooling systems.

The outside of the auditorium with the scaffolding for the masons.

One of the crane operators that have played an important role in the construction process.

The high-bay area looking west.