The entire south face has now been covered in brick and the windows
are being installed.
(July 31)
|

A photo of the front of the building with the structure for the
sloped window wall and auditorium in the background.
|

The structure for the large window wall is finished and waiting
for the window contractor to install the glass.
|

A view through the window wall from inside on the second floor. |

Scaffolding for the masons on the front of the building. |

The window wall wraps around the auditorium. Here is the intersection
with the auditorium roof. |

A view showing the large wing wall with the window wall in the
background.
|

Looking down the north face of Howe Hall. The brick has yet to
be laid on this side.
|

This is looking through the high-bay area from the west. You
can see the Marston Water Tower through the building.
|

With the roof beam and decking in place, the high-bay takes shape.
The overhead crane to be used in the multistory space has also
been installed.
|

Here is a view from the basement into the high-bay area that gives
a good sense of the scale of the space.
|

Concrete workers installing forms for the floor in the center
of the building.
|