The entire south face has now been covered in brick and the windows are being installed.
(July 31)

A photo of the front of the building with the structure for the sloped window wall and auditorium in the background.

The structure for the large window wall is finished and waiting for the window contractor to install the glass.

A view through the window wall from inside on the second floor.

Scaffolding for the masons on the front of the building.

The window wall wraps around the auditorium. Here is the intersection with the auditorium roof.

A view showing the large wing wall with the window wall in the background.

Looking down the north face of Howe Hall. The brick has yet to be laid on this side.

This is looking through the high-bay area from the west. You can see the Marston Water Tower through the building.

With the roof beam and decking in place, the high-bay takes shape. The overhead crane to be used in the multistory space has also been installed.

Here is a view from the basement into the high-bay area that gives a good sense of the scale of the space.

Concrete workers installing forms for the floor in the center of the building.