|

Workers pouring the first floor .
(Feb. 12)
|

Part of the formwork for the circular auditorium.
|

A portion of the outside of the circular auditorium with the forms removed.
|
|

Getting taller! They're getting ready to pour the second floor.
|

This is a view of the site from the balcony of the Design Center.
|

It's been a wet winter for the workers on the site.
|
|

Pouring another portion of the first floor.
|

Concrete trucks backed up to supply the concrete pumper.
|

A view showing some of the formwork for the second floor, with some of the first floor columns in the foreground.
|