Workers pouring the first floor .
(Feb. 12)


Part of the formwork for the circular auditorium.


A portion of the outside of the circular auditorium with the forms removed.


Getting taller! They're getting ready to pour the second floor.


This is a view of the site from the balcony of the Design Center.


It's been a wet winter for the workers on the site.


Pouring another portion of the first floor.


Concrete trucks backed up to supply the concrete pumper.


A view showing some of the formwork for the second floor, with some of the first floor columns in the foreground.