|

A view of the high-bay area that will be open from ground floor to the roof.
(Feb. 24)
|

Looking up from inside the high-bay area.
|

A view from the inside the circular auditorium.
|
|

Looking across the construction toward the Design Center.
|

Underneath the first floor.
|

Looking southeast toward Beyer Hall.
|
|

A good shot that shows the size and complexity of the structure.
|

One of the many workers on the site working on the formwork for a column .
|

The outside of the circular auditorium.
|